DrSubrat Das

Senior Lecturer in Mechanical Engineering

Faculty of Science Engineering and Built Environment/School of Engineering

  • Senior Lecturer in Mechanical Engineering
    Faculty of Science Engineering and Built Environment/School of Engineering
  • +61 3 522 72387 (Work)
  • Geelong Waurn Ponds Campus, 75 Pigdons Road, Waurn Ponds, Victoria 3216

RESEARCH INTERESTS

Fluidized bed

http://www.deakin.edu.au/~subrat

GRANTS

  • CONTRACT RESEARCH
    REACH Schedule 2 - ArcActive Australia - NEW Stream 3 - Battery Electrolyte Exchange Validation & Optimisation Using Computational Fluid Dynamics Variation 1
    14 Jul 2026 - 30 Jun 2027
    People funded by this grant:
    ArcActive Australia Pty Ltd - $606,844.00
  • CONTRACT RESEARCH
    Flow Analysis of Wind Loads on Solar Panels.
    18 Jan 2021 - 31 May 2021
    People funded by this grant:
    Australian Pipeline Limited t/as APA Group - $30,000.00
  • CONTRACT RESEARCH
    Systematic paring tube design tool to enhance the utility of Centriherm - Stage 2
    19 Mar 2018 - 12 Dec 2018
    People funded by this grant:
    • Subrat Das
    Flavourtech Pty Ltd - ICG0000435 - $49,938.00
  • CONTRACT RESEARCH
    Systematic paring tube design tool to enhance the utility of Centriherm - Stage 2
    19 Mar 2018 - 12 Dec 2018
    People funded by this grant:
    • Subrat Das
    Department of Industry, Innovation and Science - $49,938.00
  • CONTRACT RESEARCH
    Systematic paring tube design tool to enhance the utility of Centriherm
    19 Apr 2017 - 19 Dec 2017
    People funded by this grant:
    • Subrat Das
    Flavourtech Pty Ltd - ICG000435 - $40,074.00
  • CONTRACT RESEARCH
    Systematic paring tube design tool to enhance the utility of Centriherm
    19 Apr 2017 - 19 Dec 2017
    People funded by this grant:
    • Subrat Das
    Department of Industry, Innovation and Science - $40,074.00
  • CONTRACT RESEARCH
    RP2-07C Pipeline health monitoring and life prediction
    30 Nov 2012 - 31 Dec 2015
    People funded by this grant:
    Energy Pipelines CRC - $429,500.00
  • CONTRACT RESEARCH
    RP2-08B Transient Loss of Cathodic Protection - Phase 2
    1 Oct 2012 - 30 Sep 2015
    People funded by this grant:
    Energy Pipelines CRC - $299,000.00